Building Code Administration
BCAP Process
- BCA (USF BCA Program)
- BCA Fee Schedule for USF Tampa Campus
- BCA Fee Schedule for Other Than USF Tampa Campus
- BCA-Form 00 Building Plans Review & Permit Checklist
- BCA-Form 01 Design Document Review-Request
- BCA-Form 01A Design Document Review-Project Directory
- BCA-Form 02 Plans Review- Request to BCA
- BCA-Form 03 Building Permit Application
- BCA-Form 03A Building Permit Application-Construction Directory
- BCA-Form 05 Inspection Request
- BCA-Form 07 Certificate of Occupancy-Request
- BCA-Form 07A Certificate of Occupancy-List of Spaces
- BCA-Form 08 Certificate of Completion-Request
- BCA-01 (SFM Review Process)
- BCA-02 (Tent Permit)
- BCA-03 (Architect's Services)
- BCA-04 (Title II Impacts)
- BCA-05 (Fire Code Changes)
- BCA-06 (USF Tampa Campus Wind Requirements)
- BCA-07 (Determining Existing Electrical Load)
- BCA-09 (HVAC Replacement)
- BCA-10 (Contractor-AE Requirements)
- BCA-11 (Laboratory Design)
- BCA-11H (Healthcare Laboratory Design)
- BCA-12 (Fast Track Permitting)
- BCA-13 (Asbestos Abatement & Mold Flood Mitigation)
- BCA-14 (Switched Outlets)
- BOAF Code Compliant Document Guide-Part A